Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2 - Details
Niagara Falls Public Library Logo
Mark this record
Mark this record
View Search History
Go to Images database home
Go to Digital Collections home
Resize image: [+]  [-]
   Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2 (image/jpeg)
Title Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
Creator  Helie, Fred
Medium  Photograph
Extent  5" x 4" black & white photograph from album My Three and One Half Years Underground by Fred Helie
Description  Photographs were taken by Fred Helie, a worker on the project sometime between 1950 - 1958
Notes  Well-drillers at work. An 18 inch hole was bored through the surface straight down to the tunnel below, averaging from 290 ft to 350 ft in depth, depending on the location. These holes were bored at 400 ft. intervals, following the contour of the tunnel below. A 10" steel pipe was then inserted for the full length of the hole. This pipe in turn was used to drop the concrete to a hopper in the tunnel which in turn transferred it to the pumpcrete machines
Provenance  Donated by Fred Helie
Date  1953.
Collection  Fred Helie Collection
Old Call Number  LHC FH Collection
Rights Holder  Niagara Falls Public Library
Rights  Fred Helie
Subject  Hydro Electric Power - Tunnels - Construction
  Power Plants - Sir Adam Beck 2
Place Name  Queenston (inhabited place)
Record ID  89820
Digital image 
Format image/jpeg
Size  725px X 583px
Resolution  150ppi X 150ppi
Digitization B&W Scan
Equipment Epson Perfection 1260
Date 2002-12-13
Physical items 
Filing No.   Format       
D10690  Photograph     

 

Use of this website signifies your acceptance of the Terms Of Use. [back] Copyright ©2001-2013, Niagara Falls Public Library. Contact Us